Technology Infrastructure

Data Centre & IT Infrastructure Facility

Specialist compliance consulting for data centres, IT parks, and server room infrastructure — covering TIA-942 Tier classification, electrical redundancy, precision cooling, fire suppression, and physical security standards.

Specialized Services

Applicable regulations & standards

TIA-942 Standard — Data Centre Infrastructure Standard (Tier I–IV Classification) Statutory Authority / BIS
View Statutory Summary & Standards →
Uptime Institute Tier Certification Standards Statutory Authority / BIS
View Statutory Summary & Standards →
NBC 2016 — Special hazard occupancy provisions for UPS/battery rooms Statutory Authority / BIS
View Statutory Summary & Standards →
NFPA 75 — Standard for the Protection of Information Technology Equipment Statutory Authority / BIS
View Statutory Summary & Standards →
Bureau of Energy Efficiency (BEE) — PUE (Power Usage Effectiveness) benchmarks Statutory Authority / BIS
View Statutory Summary & Standards →
CEA (Central Electrical Authority) Regulations for HT electrical installations Statutory Authority / BIS
View Statutory Summary & Standards →
National Cyber Security Policy — Physical security for Tier III+ data centres Statutory Authority / BIS
View Statutory Summary & Standards →

Our services in this sector

Tier Classification Design Review (TIA-942) +

TIA-942 Tier I to Tier IV classify data centres by redundancy level. Banks, insurance companies, and government agencies typically require Tier III (N+1 redundancy, 99.982% uptime). We audit designs against Tier requirements before construction.

  • Power path redundancy: single feed (Tier I) to 2N fully redundant dual-path (Tier IV)
  • Cooling redundancy: N, N+1, or 2N precision air conditioning units
  • UPS system: runtime calculation, battery room design (ventilation, spill containment)
  • Generator: automatic transfer switch (ATS), fuel tank sizing for 72-hour runtime
  • Critical load calculation and power density per rack (kW/rack)
Precision Cooling & Raised Floor Design +
  • Hot-aisle/cold-aisle containment design for optimal airflow
  • CRAC (Computer Room Air Conditioning) unit sizing and placement
  • Raised floor: 600 mm minimum height, load capacity for server rack point load
  • Perforated tile placement planning for uniform cold air distribution
  • Humidity control: 45–55% RH maintained year-round in Gujarat's climate
Fire Suppression for IT Environments +

Water-based sprinklers damage servers and are avoided in IT rooms. Clean-agent systems (FM200, Novec 1230) are used. These require specific room integrity and hold-time calculations.

  • Clean-agent system design: FM200 or Novec 1230 concentration and hold time (10 minutes)
  • Room integrity test (door fan test) to verify agent retention
  • Pre-action sprinkler system for sub-floor and above-ceiling areas
  • Fire detection: very early smoke detection apparatus (VESDA) for laser particle counting
  • NFPA 75 compliance documentation for insurance and RBI (for bank data centres)
Physical Security Infrastructure +
  • Multi-factor access control: biometric + card reader for server hall entry
  • Man-trap (airlock) for server room entry
  • CCTV: all access points, server aisles, loading dock — 90-day retention
  • Visitor management and escort policy reflected in physical layout
  • Perimeter fence and bollards for facility-level vehicle attack prevention

Critical sector considerations & benefits

  • Tier certification enables co-location revenue from corporate clients requiring SLA uptime
  • Optimised PUE (Power Usage Effectiveness) reduces electricity cost by 25–40%
  • Insurance premium reduction for FM200/VESDA-equipped facilities
  • RBI / IRDAI / SEBI compliance for regulated entity data centres

Engagement process & milestones

01

Preliminary Statutory & Revenue Audit

2-3 Working Days

Scrutiny of 30-year revenue records, AnyROR entries, and applicable sector regulations.

02

Site & Spatial Ground Verification

3-5 Working Days

On-ground ETS survey, boundary demarcation, and physical setback verification.

03

NOC & Regulatory Compliance Scrutiny

4-6 Working Days

Cross-checking zoning, master plan reservations, fire safety, and environmental clearances.

04

Title Clearance & Legal Opinion Delivery

2 Working Days

Issuance of comprehensive advocate certified legal opinion and digital verification certificate.