Residential Development

Residential Complex & Gated Community

End-to-end compliance for residential complexes, gated communities, and township projects — from RERA registration and GDCR compliance to amenity standards, STP design, and handover punch-list verification.

Specialized Services

Applicable regulations & standards

RERA (Real Estate Regulation and Development Act 2016) — GujRERA Statutory Authority / BIS
View Statutory Summary & Standards →
GDCR 2017 — Residential Zone (R1, R2, R3) norms Statutory Authority / BIS
View Statutory Summary & Standards →
Gujarat Apartment Ownership Act 1973 — Society formation and handover Statutory Authority / BIS
View Statutory Summary & Standards →
National Green Tribunal (NGT) — Sewage Treatment Plant for 20+ units Statutory Authority / BIS
View Statutory Summary & Standards →
NBC 2016 — Part 9: Plumbing and Drainage for high-rise residential Statutory Authority / BIS
View Statutory Summary & Standards →
Gujarat Housing Board norms for affordable housing Statutory Authority / BIS
View Statutory Summary & Standards →
Green Building Rating: GRIHA, IGBC, or BEE star rating for new townships Statutory Authority / BIS
View Statutory Summary & Standards →

Our services in this sector

GDCR & RERA Compliance +

Residential projects in Gujarat must comply with GDCR for FSI, setbacks, height, and parking — and simultaneously register on GujRERA before accepting any bookings.

  • Permissible FSI calculation with TDR, premium FSI, and balcony loading
  • Setback verification: front, rear, side setbacks per plot area and building height
  • Parking calculation: 1 ECS per unit (50 sq m+), visitor parking, cycle parking
  • GujRERA registration: project details, timeline, escrow account setup
  • Allotment letter and sale agreement vetting against RERA standard format
  • Quarterly progress report preparation for GujRERA portal
Sewage Treatment Plant (STP) Compliance +

NGT mandates STP for residential projects generating more than 10 KLD (kilolitres per day) of sewage — roughly 20+ units. Untreated effluent discharge attracts penalties of ₹5,000–50,000 per day.

  • STP capacity sizing: 80 litres per person per day design flow
  • Technology selection: MBBR, SBR, or MBR based on space and reuse requirements
  • Treated water quality check: BOD <10 mg/L for garden/flushing reuse
  • GPCB CTE/CTO application for STP installation
  • Sludge disposal plan: drying beds, composting, GPCB-registered disposal
Amenity Standards & Common Area Compliance +
  • Swimming pool: CPWD standards for depth, safety, pump room, chemical storage
  • Children's play area: IS 15567 (playground equipment safety), soft-fall surfacing
  • Gym/clubhouse: NBC Part 4 assembly occupancy provisions
  • Lift: CEA Regulations for lift installations, load and speed certificates
  • Generator: CPCB noise norms — acoustic enclosure for DG sets above 5 kVA
Handover & Society Formation Support +
  • Snag list compilation: room-by-room punch-list for each unit before possession
  • Common area punch-list: clubhouse, parking, STP, landscaping, signage
  • Society (CGST) formation documentation and handover of common area maintenance
  • As-built drawing set preparation for society records
  • OC (Occupancy Certificate) and CC (Completion Certificate) chase

Critical sector considerations & benefits

  • RERA compliance reduces buyer complaint risk (penalty up to 5% of project cost)
  • STP compliance avoids NGT closure notices that have stopped entire projects
  • Structured handover improves buyer satisfaction and reduces post-possession disputes
  • Green building rating increases property value and reduces HOA electricity cost

Engagement process & milestones

01

Preliminary Statutory & Revenue Audit

2-3 Working Days

Scrutiny of 30-year revenue records, AnyROR entries, and applicable sector regulations.

02

Site & Spatial Ground Verification

3-5 Working Days

On-ground ETS survey, boundary demarcation, and physical setback verification.

03

NOC & Regulatory Compliance Scrutiny

4-6 Working Days

Cross-checking zoning, master plan reservations, fire safety, and environmental clearances.

04

Title Clearance & Legal Opinion Delivery

2 Working Days

Issuance of comprehensive advocate certified legal opinion and digital verification certificate.

Verified Project Evidence & Field Audits

Verified Case Files
Township Boundary Demarcation & DILR Re-measurement

Shela Extension, Ahmedabad — 45 Acre Gated Community