Skip to Content
Gujarat Jurisdiction — Property Legal Due Diligence & Advisory SecureProp Gujarat
English
| +1 555-555-5556
Hospitality Infrastructure

Hotel & Hospitality Facility Construction

Comprehensive compliance consulting for hotels, resorts, and banquet halls — covering Ministry of Tourism star classification, FSSAI kitchen norms, liquor-licence building requirements, and guest safety standards.

Specialized Services

Applicable regulations & standards

  • Ministry of Tourism — Star Classification Guidelines (1-Star to 5-Star)
  • Hotel & Restaurant Approval and Classification Committee (HRACC) norms
  • FSSAI (Food Safety and Standards Authority) — Food Business Operator licence
  • Gujarat Prohibition Act (for liquor licence FL-2) — room and bar area requirements
  • NBC 2016 — Assembly and Hotel occupancy fire safety provisions
  • Gujarat Shops and Establishments Act
  • RPWD 2016 accessibility requirements

Our services in this sector

Star Classification Infrastructure +

HRACC evaluation covers 200+ physical parameters including room size, amenity count, kitchen capacity, laundry, swimming pool, and handicapped accessibility. We audit your design against the classification you are targeting.

  • Guest room dimensions: 3-star minimum 14 sq m, 5-star minimum 28 sq m (carpet)
  • En-suite bathroom: 3-star minimum 4 sq m; 5-star — rain shower, dual vanity, jacuzzi norms
  • Swimming pool: depth markers, pool pump room, chemical storage, lifeguard platform
  • Restaurant seating capacity and dining area per seat (0.9 sq m minimum)
  • Banquet hall: 1 sq m per person, fire-rated partition options, kitchen adjacency
  • Lobby height: 4.5 m minimum for 4-star and above
Commercial Kitchen & FSSAI Compliance +

Hotel kitchens require FSSAI Food Safety Licence and must comply with Schedule 4 of FSSAI Regulations. Kitchens serving more than 50 covers are also subject to Gujarat Pollution Control Board consent if they operate solid-fuel equipment.

  • Kitchen zone segregation: receiving, dry store, cold store, preparation, cooking, plating, dishwash
  • FSSAI Schedule 4: floor-to-ceiling washable tiles, stainless steel work surfaces, adequate cold storage
  • Exhaust canopy design: 0.4 m overhang, grease trap filters, fire suppression system
  • Pest control access points: door sweeps, fly screens, UV traps — inspectable by FSSAI
  • Hygiene station: handwash before entry, separate handwash from food prep sinks
Guest Safety & Emergency Systems +
  • Guest room fire alarm: addressable system with in-room detector + sounder + door hold-open
  • Green exit signage: every guest floor, visible from any point within 30 m
  • Lifts: additional firefighter lift (Fireman's Lift) for buildings above 15 m
  • Swimming pool safety: anti-entrapment drain covers, depth markers, pool alarm
  • CCTV: public areas, lobby, parking — no cameras in rooms or bathrooms (mandatory)
  • Key card room entry system: electrical power cut-off linked to key card removal

Critical sector considerations & benefits

  • Achieve target star classification on first HRACC inspection
  • FSSAI licence without stop-notice from food safety officer
  • Avoid guest-safety incidents that attract regulatory closure and media scrutiny
  • Premium ADR (Average Daily Rate) through documented compliant facilities

Engagement process & milestones

01

Preliminary Statutory & Revenue Audit

2-3 Working Days

Scrutiny of 30-year revenue records, AnyROR entries, and applicable sector regulations.

02

Site & Spatial Ground Verification

3-5 Working Days

On-ground ETS survey, boundary demarcation, and physical setback verification.

03

NOC & Regulatory Compliance Scrutiny

4-6 Working Days

Cross-checking zoning, master plan reservations, fire safety, and environmental clearances.

04

Title Clearance & Legal Opinion Delivery

2 Working Days

Issuance of comprehensive advocate certified legal opinion and digital verification certificate.

Ask on WhatsApp